Aesthon Labs logoAesthon Labs

Aesthon Foreman · Live

Stop running OEE meetings.
Let agents run them.

Foreman plugs into your MES and runs the research, root-cause analysis, and corrective actions your team does manually every week, so engineers act on decisions, not hunt for data.

Scroll

In conversation with

In conversation with

Four automotive plants in Malaysia are walking through their MES with us. We'll name them when they're ready.

  • Tier-2 supplier

    Stamping · Selangor

  • Tier-1 supplier

    Powertrain · Johor

  • Tier-2 supplier

    Plastics · Shah Alam

  • Tier-2 supplier

    Assembly · Penang

01 · The problem today

Your plant runs in real time.
Your OEE meeting runs once a week.

Every Monday, engineers hunt through MES exports, pivot OEE spreadsheets, and argue over which deviation came first. By the time a corrective action ships, three more shifts have run with the same loss.

  1. 01 · Mon · 08:00

    Monday meeting

    Engineers and supervisors decode last week's OEE by hand. The cycle restarts before the action shipped.

    Cost · Once a week

  2. 02 · +90 min

    Spreadsheet export

    MES exports pivoted, joined with QA logs, normalised by line and shift. The same query, rebuilt every Monday.

    Cost · 8h / engineer / week

  3. 03 · +2 days

    Root-cause hunt

    Eight emails, three meetings, a Teams thread. The deviation is still unconfirmed by Wednesday.

    Cost · Cross-functional ping-pong

  4. 04 · Next week

    Action deferred

    The decision gets parked. Nothing writes back to the line. The loop never closes.

    Cost · The cycle severs here

  5. 05 · Ongoing

    Loss continues

    By the time anyone re-opens the file, the same loss has run for three more shifts on the same line.

    Cost · 3 shifts repeat the fault

Cycle break · 4d 7h open-loop

  • 0 hrs

    per engineer per week lost to data preparation, root-cause hunts, and meeting prep

  • 0 days

    typical lag from a line anomaly to a documented corrective action

  • 0%

    of plant insights live in slide decks and Excel, not in workflows that act

Estimates based on conversations with Tier 1/2 plants in Southeast Asia. Replace with your own.

02 · The reframe

The decision layer your plant has been missing.

Above your MES. Below your engineers. Foreman agents read your data, reason over context, and surface the next correct action in seconds, not in Monday meetings.

SOURCESDECISIONSMESSCADAHISTORIANQUALITYForeman Decision LayerSENSEREASONRECOMMENDALERTSETPOINTAPPROVAL

03 · How it works

Three layers that turn plant data into plant decisions.

Each pillar runs continuously over the same MES, SCADA, and historian data your plant already produces — no second platform, no second dataset.

  • Holographic decision-tree workflow on a transparent panel above a circuit board — the Foreman decision layer.

    01

    LIVE

    Pillar 01

    Decision Layer

    Agents that act on context, not dashboards.

    Read your MES events, reason over 14 days of plant context, and surface the next correct action with a confidence score. Engineer approves; agent dispatches.

    • Root-cause hypotheses
    • Confidence-scored recommendations
    • Auto-dispatch with human approval

    REASONING · CONF 87%

    T+3.2s

  • Engineer in front of a holographic 3D plant model surrounded by data panels — the Foreman digital twin.

    02

    LIVE

    Pillar 02

    Digital Twin

    A live, queryable mirror of every line.

    Stream MES, SCADA, and historian signals into a single observability surface. Ask plain-English questions like 'why did Line 4 stall?' and get answers grounded in your real data.

    • Line, asset, and OEE views
    • Plain-English query
    • Time-travel debugging

    PLANT TWIN · 4 / 312 SIGNALS

    Δt 250ms

  • Holographic agents at terminals in a server room with the AGENT ENGINE control panel — the Foreman agent engine.

    03

    LIVE

    Pillar 03

    Agent Engine

    Agents trained on your plant, not the internet.

    Customize agent behavior, KPIs, SOPs, and approval gates per plant, per line, per shift. Built for the way your team actually works, not a generic AI template.

    • Per-plant SOPs
    • KPI-aware reasoning
    • Audit-grade decision trails

    AGENTS · 4 RUNNING · PLANT 02

    UPTIME 99.97%

04 · Where it fits

We sit on top of what you already have.

Foreman is a decision layer, not a data platform. We plug into your MES, SCADA, and historian (read-only by default), and surface actions to the engineers who already run the line.

  • 01No new hardware. No new sensors.
  • 02No replacement of your MES or dashboards.
  • 03Read-only integration, audit-graded write-back.
  • 04Deployable in your VPC or our managed cloud.
03
HumansPlant team retains control
Illustrated portrait of a plant director holding a clipboard

Plant Director

Approvals

Illustrated portrait of a process engineer reviewing a holographic schematic

Process Engineer

Oversight

Illustrated portrait of a senior engineer with a ruggedized tablet on the line

Senior Engineer

Real-time

02
Foreman · Decision LayerDigital twin · Agent engine
Live
SENSEREASONRECOMMENDACTFOREMAN
Loop · 24/7Sense → Reason → Recommend → Act
01
Your stackExisting plant systems

MES

SCADA

Historian

PLCs

WonderwareIgnitionRockwellOPC-UA

05 · A Monday morning

06:00 · Line 4 stalls.
By 07:00, it's already fixed.

The agent's path through the incident — from plant signal to restored OEE — drawn as the flow it actually is.

inputs · always-on

MESSCADAHistorian
  1. step 01

    Sense

    anomaly detected

    L4 · OEE −11%

  2. step 02+5s

    Reason

    evidence + tools

    context ranked

    • query_mes14d · 4,218 cycles
    • torque_historydrift · 142 Nm
    • sop_lookupSOP-447 · §3.2
  3. step 03+2m 9s

    Recommend

    action proposed

    SOP-447 §3.2

  4. step 04+1m 24s

    Approve

    engineer sign-off

    eng_id=4421

  5. step 05+0s

    Act

    write-back

    MES action A-8814

  6. step 06+56m 18s

    Outcome

    OEE 88.1%

    standup cancelled

  1. · step 1 · Sense · anomaly detected · L4 · OEE −11%
  2. · step 2 · Reason · evidence + tools · context ranked
  3. · step 3 · Recommend · action proposed · SOP-447 §3.2
  4. · step 4 · Approve · engineer sign-off · eng_id=4421
  5. · step 5 · Act · write-back · MES action A-8814
  6. · step 6 · Outcome · OEE 88.1% · standup cancelled
  7. tool · query_mes · 14d · 4,218 cycles
  8. tool · torque_history · drift · 142 Nm
  9. tool · sop_lookup · SOP-447 · §3.2

Illustrative scenario · ~30s compressed from a 1-hour incident. Numbers, SOP refs and station IDs are placeholders for the plant context Foreman learns during onboarding.

· Talk to us

Show us your slowest line.
We'll show you where agents fit.

A 30-minute discovery call with the team. We'll walk through your MES, your OEE workflow, and where agents could meaningfully change your week. No deck.

Built for Tier 1 & Tier 2 automotive manufacturers · Kuala Lumpur